Projects
JFK Park and Marina Restoration
Yonkers, NY

The material processed from our Lafarge quarry was utilized to line a riverbank in Yonkers.  Roughly 1,700 tons of these 2 -3 -ton boulders were excavated with intent to keep them fairly uniform in size, shape and color, giving the river bank a very clean look.

Halloween Storm Hangover 2019
Throughout Upstate NY

A bad storm passed through the upstate NY area on October 31st, 2019 devastating travel-ways such as rail, road, and river.  Nearly 50,000 tons of various materials such as railroad ballast, crusher run, and rip rap stone fills, were pulled from our Johnstown and Schoharie quarries to re-open these much-needed arteries.

A blocked canal lock needed to be accessed to remove the misc. debris. Our stone fills were used to make a roadway in the canal to access and remove the debris.

Our crusher run was used to reinforce roadways.

Rockaway Project
Rockaway Beach, Queens, NY

Granite material used from our Johnstown quarry being placed as break walls in the Atlantic Ocean. 7.5-12.5 ton boulders mined from our Johnstown quarry are carefully being sized and loaded onto our Carver trucks.

Get In Touch
Connecting the World to the East Coast
Learn what Carver can do for you, get in touch with us for a quote on your next job. (* = Required)
If you are interested in career opportunities at Carver Companies please fill out an application in our Careers section.
250 Character(s) Remaining
Florida:
Maritime division
South Carolina:
Maritime division
New York:
Aggregates, Construction and Maritime divisions
Massachusetts:
Maritime division
Canada:
Aggregates division